The framing is finally complete, at least the bulk of it. There are still a few doors and windows to install, but the bones of the house are in, and just in time for the snow!  Inside, a lot more electrical roughing in has been done, most of the outlets and switches look to have [...]

Continue reading...

0

Merry Christmas everyone! This was a short week for the crew, but I am still amazed by their progress.  This week the HVAC, plumbing and electrical started going in, and all the second floor framing for the new construction is done. By the end of next week the roof over the new area will be [...]

Continue reading...

0

With the holidays coming up I have been pretty busy, so these are up late.  I stopped by the house on a whim early last week and was surprised to find a crew filling in the excavation.  I took those pics with my new phone, a MyTouch 4G, and I have to say they are [...]

Continue reading...

0

Things slowed down this week a little bit as a nasty cold swept through the crew.  As you can see, the framing for the dormer is getting close to done, and the back wall of the house has been disassembled to prepare for the insertion of the door and the stairwell.  Our contractor has had [...]

Continue reading...

0

So much happened last week I had to return to the house on Friday to get new photos.  It’s amazing how the addition of the roofing material changes the scale of the rooms upstairs.  The windows and doors are delivered and I am so excited by how nice they look.  We upgraded the first floor [...]

Continue reading...

2

There is so much going on this week I already have to post photos.  I worked from home on Tuesday because the crane was supposed to come and move the trusses up for installation.  Unfortunately he was only there for an hour, so when I arrived the crane was long gone and two trusses were [...]

Continue reading...