Merry Christmas everyone! This was a short week for the crew, but I am still amazed by their progress.  This week the HVAC, plumbing and electrical started going in, and all the second floor framing for the new construction is done. By the end of next week the roof over the new area will be completed and sealed in, and then drywall isn’t far behind.

Amy and I need to get on the ball and pick colors for our stucco, trim, and finalize lighting fixture choices! So much to do!

House Remodel Week 9
Mason standing in my future office space
Mason standing in my future office space
With the deck up, I can look back down the south side of the second floor
With the deck up, I can look back down the south side of the second floor
Looking out onto the nothern porch
Looking out onto the nothern porch
HVAC is starting to go in
HVAC is starting to go in
Rough electrical is starting to appear
Rough electrical is starting to appear
A jungle of wires in the kitchen
A jungle of wires in the kitchen
Mason conquering the backyard
Mason conquering the backyard
Future backdoor area
Future backdoor area
Walled in door and recycled window sill
Walled in door and recycled window sill