I realize that I skipped a week, and that my math is probably off and we aren’t really on week 12, so I will let you do the math from now on, and just post updates numerically. There has been a lot of progress since I last posted. Our framing is complete (really complete), the stairs are done, the HVAC, electrical and plumbing are all roughed in to completion, network cable has been run, and much much more. I have a whole bunch of stuff I want to share about this process and what has been going on, but I will split that into a couple of other posts so as not to bore/overwhelm you.
House Remodel Update 12
Looking down on the front stairwell through the laundry room wall
|
Looking straight down through the laundry room wall
|
Looking up from the first landing on the stairs
|
The framing for the front coat closet
|
First stair landing with wrapping steps
|
Rear stairwell
|
Rear stairwell
|
Kids in the basement by the new stairs
|
Back door installed (wrong door)
|
Rear of house with back door and kitchen window
|
Scaffolding going up
|
Front of house with scaffolding
|
Windows installed in the rear stairwell
|
Basement egress window installed. So much light!
|
View of the backyard from the basement egress window
|
Kitchen window (wrong one)
|
Framing to wall in the old door between the kids rooms
|
Shot of the support post in the wall
|
All windows installed in the playroom
|
Windows installed in the office alcove
|
Rear of house with all windows installed and scaffolding
|
25 January, 8:18 am
Judging by the full length shot of the side, you’re going to live in a mansion! Cool!!!