1

This week was drywall week, and the inside of the house changed dramatically.  Unfortunately, with the walls sealed off it becomes increasingly hard to photograph, so I just took a few interior photos to give the general idea of how things look.

Outside the house, the trim is all installed, and the walls are all ready for stucco. Unfortunately we are heading into a bad winter storm, so the stucco will have to wait until we have some consistently warmer temperatures.  The corbels and barge rafters were also installed so things are really looking nice outside.

House Remodel Update 13
Front of house with trim
Front of house with trim
NE Corner of house with trim
NE Corner of house with trim
North side of house with trim
North side of house with trim
Posts wrapped and installed corbel
Posts wrapped and installed corbel
Master bath w/drywall
Master bath w/drywall
Closet w/drywall
Closet w/drywall
Office nook w/drywall
Office nook w/drywall
Master bedroom w/drywall
Master bedroom w/drywall
Hallway w/drywall
Hallway w/drywall
Bay window in playroom w/drywall
Bay window in playroom w/drywall
Masons bedroom w/drywall
Masons bedroom w/drywall
Stairwell landing w/drywall
Stairwell landing w/drywall
Looking up at stairwell w/drywall
Looking up at stairwell w/drywall
Back of house with trim, angled
Back of house with trim, angled
Back of house with trim
Back of house with trim
South side of house with trim
South side of house with trim


One comment to “Progress Photos #13”

  1. Ellen

    It’s lookin’ good!


Trackbacks/Pingbacks


Leave a comment