This week they spent a lot of time working on the old roof over the porch.  They replaced the decking, and somehow (I’m almost afraid to ask) they got it pulled in so it’s flush with the brick wall.  I realize now I don’t have a good photo of it, but the porch was leaning out almost an inch and a half past the brick wall.  We weren’t sure if this was going to be possible, so I am excited that it worked out.

The electrical (mostly lighting) and plumbing rough-in work seems to be mostly done now.  They also have gotten started on the stairs, the landings are framed in for both the front and back stairwells.

House Remodel Week 11
Decking replaced on the porch roof
Decking replaced on the porch roof
Wide shot of the progress so far
Wide shot of the progress so far
The porch is now flush with the brick wall
The porch is now flush with the brick wall
Door to deck installed
Door to deck installed
Other deck door installed
Other deck door installed
Plumbing rough ins
Plumbing rough ins
Madeleine insisted on posing in the bathroom
Madeleine insisted on posing in the bathroom
Landing for the rear stairs installed
Landing for the rear stairs installed
Looking straight down into the basement stairwell
Looking straight down into the basement stairwell
Back of house with doors installed
Back of house with doors installed
First landing in the front stairwell
First landing in the front stairwell
Second landing in the front stairwell
Second landing in the front stairwell


Leave a comment