We are now officially past the 2/3 mark, which means that we have less than two months until we get to move back in! Here is a quick list of all the things that have changed since I last updated:
- Exterior trim for new construction mostly painted
- Texture for all new drywall done (new upstairs, matching downstairs)
- New kitchen window installed
- Top rails for stairwell installed
- Carpet removed from family room (floors look in good shape!)
- Tile done in laundry room
- All but two of the new doors installed
And of course… pics or it didn’t happen:
House Remodel Update 15
Front of house with painted trim
|
Front and side of house with painted trim
|
Kitchen with new window
|
Family room with carpet removed and texture
|
Living and dinings room with new ceilings
|
Wooden rail on banister
|
Tile in laundry room
|
Madeleines room with closet doors
|
Detail of the top of the railing
|
Door to the bathroom
|
Master closet shelf
|
Playroom with most of the paper off the windows
|
Door to Madeleines room
|
Detail of painted tails
|
Wide view of house with painted trim
|
Side of house with painted trim
|
Back of house with painted trim
|
South side of house with painted trim
|
Wide view of post apocalyptic back yard
|
Detail of post apocalyptic back yard
|
Leave a comment