We are now officially past the 2/3 mark, which means that we have less than two months until we get to move back in! Here is a quick list of all the things that have changed since I last updated:

  • Exterior trim for new construction mostly painted
  • Texture for all new drywall done (new upstairs, matching downstairs)
  • New kitchen window installed
  • Top rails for stairwell installed
  • Carpet removed from family room (floors look in good shape!)
  • Tile done in laundry room
  • All but two of the new doors installed

And of course… pics or it didn’t happen:

House Remodel Update 15
Front of house with painted trim
Front of house with painted trim
Front and side of house with painted trim
Front and side of house with painted trim
Kitchen with new window
Kitchen with new window
Family room with carpet removed and texture
Family room with carpet removed and texture
Living and dinings room with new ceilings
Living and dinings room with new ceilings
Wooden rail on banister
Wooden rail on banister
Tile in laundry room
Tile in laundry room
Madeleines room with closet doors
Madeleines room with closet doors
Detail of the top of the railing
Detail of the top of the railing
Door to the bathroom
Door to the bathroom
Master closet shelf
Master closet shelf
Playroom with most of the paper off the windows
Playroom with most of the paper off the windows
Door to Madeleines room
Door to Madeleines room
Detail of painted tails
Detail of painted tails
Wide view of house with painted trim
Wide view of house with painted trim
Side of house with painted trim
Side of house with painted trim
Back of house with painted trim
Back of house with painted trim
South side of house with painted trim
South side of house with painted trim
Wide view of post apocalyptic back yard
Wide view of post apocalyptic back yard
Detail of post apocalyptic back yard
Detail of post apocalyptic back yard


Leave a comment